S. 1ST AVE over MAIN STAYTON CANAL
IN STAYTON · County 047, Oregon · Built 1965 · 2 Lanes · 1,400 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
44.7952, -122.7944
This bridge is in worse condition than 25.9% of bridges in County 047. The average bridge in Oregon is 0 years old; this one is 61 years old.
Nearby Bridges
EAST WATER ST over MAIN STAYTON CANAL
Built 1973
N 4TH AVE. over MAIN STAYTON CANAL
Built 1973
N. SECOND AVE over SALEM DITCH
Built 1965
N. FIRST AVE over SALEM DITCH
Built 1968
N.THIRD AVE over SALEM DITCH
Built 1970
COUNTY RD 601 over NORTH SANTIAM RIVER
Built 1965
STAYTON-SCIO RD over N SANTIAM R OVERFLOW
Built 1964
N. HOLLY AVE over MAIN STAYTON CANAL
Built 1970
W WASH ST over SALEM DITCH
Built 1975
JETTERS WAY over MAIN STAYTON CANAL
Built 1975
Bridge Details
- Structure #
- 05351A066 00025
- Year Built
- 1965
- Length
- 32.9 m (107.9 ft)
- Max Span
- 10.4 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 1,400
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $327,000
- Total Project Cost
- $523,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.