STAYTON-SCIO RD over N SANTIAM R OVERFLOW
005 MI S CITY OF STAYTON · County 043, Oregon · Built 1964 · 2 Lanes · 7,725 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
44.788731, -122.794389
This bridge is in worse condition than 5.5% of bridges in County 043. The average bridge in Oregon is 0 years old; this one is 62 years old.
Nearby Bridges
COUNTY RD 601 over NORTH SANTIAM RIVER
Built 1965
S. 1ST AVE over MAIN STAYTON CANAL
Built 1965
EAST WATER ST over MAIN STAYTON CANAL
Built 1973
N 4TH AVE. over MAIN STAYTON CANAL
Built 1973
N.THIRD AVE over SALEM DITCH
Built 1970
N. SECOND AVE over SALEM DITCH
Built 1965
N. FIRST AVE over SALEM DITCH
Built 1968
N. HOLLY AVE over MAIN STAYTON CANAL
Built 1970
JETTERS WAY over MAIN STAYTON CANAL
Built 1975
W WASH ST over SALEM DITCH
Built 1975
Bridge Details
- Structure #
- 14069 060100028
- Year Built
- 1964
- Length
- 31.4 m (103 ft)
- Max Span
- 10.4 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 7,725
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $330,000
- Total Project Cost
- $528,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.