N. SECOND AVE over SALEM DITCH
01 N OF IDA STREET · County 047, Oregon · Built 1965 · 2 Lanes · 2,866 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
44.798189, -122.793311
This bridge is in worse condition than 78.9% of bridges in County 047. The average bridge in Oregon is 0 years old; this one is 61 years old.
Nearby Bridges
N. FIRST AVE over SALEM DITCH
Built 1968
N.THIRD AVE over SALEM DITCH
Built 1970
EAST WATER ST over MAIN STAYTON CANAL
Built 1973
N 4TH AVE. over MAIN STAYTON CANAL
Built 1973
S. 1ST AVE over MAIN STAYTON CANAL
Built 1965
COUNTY RD 601 over NORTH SANTIAM RIVER
Built 1965
N. HOLLY AVE over MAIN STAYTON CANAL
Built 1970
STAYTON-SCIO RD over N SANTIAM R OVERFLOW
Built 1964
W WASH ST over SALEM DITCH
Built 1975
WILCO ROAD over SALEM DITCH
Built 1968
Bridge Details
- Structure #
- 47B004000000000
- Year Built
- 1965
- Length
- 11 m (36.1 ft)
- Max Span
- 10.4 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 2,866
- Material
- Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $115,000
- Total Project Cost
- $184,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.