US101(HWY009) over GARRISON SLOUGH
01.0 MI N HWY 251 JCT · County 015, Oregon · Built 1976 · 4 Lanes · 4,886 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
42.757761, -124.497381
This bridge is in worse condition than 28.7% of bridges in County 015. The average bridge in Oregon is 0 years old; this one is 50 years old.
Nearby Bridges
US101(HWY009) over HUBBARD CREEK
Built 1984
US101(HWY009) over ELK RIVER
Built 1969
US101(HWY009) over BEAR TRAP CREEK
Built 1955
US101(HWY009) over ROCKY POINT VIADUCT
Built 1995
US101(HWY009) over MUSSEL CREEK
Built 1955
US101(HWY009) over SIXES RIVER
Built 1971
US101(HWY009) over CRYSTAL CREEK
Built 1971
ACCESS RD HWY 009 over DRAINAGE DITCH
Built 1971
US101(HWY009) over BRUSH CREEK
Built 1998
FRONT RD HWY 009 over BRUSH CREEK
Built 1955
Bridge Details
- Structure #
- 16231 009 30000
- Year Built
- 1976
- Length
- 152.4 m (500 ft)
- Max Span
- 15.2 m
- Width
- 21.9 m (71.9 ft)
- Lanes
- 4
- Daily Traffic
- 4,886
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0