US101(HWY009) over ELK RIVER

00.9 MI S HWY 250 JCT · County 015, Oregon · Built 1969 · 2 Lanes · 4,721 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00902C009 29737
Year Built
1969
Length
207.3 m (680.1 ft)
Max Span
39.6 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
4,721
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,177,000
Total Project Cost
$3,484,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.