US101(HWY009) over BEAR TRAP CREEK
07.8 MI S HWY 251 JCT · County 015, Oregon · Built 1955 · 2 Lanes · 2,681 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.723083, -124.466222
This bridge is in worse condition than 28.7% of bridges in County 015. The average bridge in Oregon is 0 years old; this one is 71 years old.
Nearby Bridges
US101(HWY009) over ROCKY POINT VIADUCT
Built 1995
US101(HWY009) over MUSSEL CREEK
Built 1955
US101(HWY009) over HUBBARD CREEK
Built 1984
US101(HWY009) over BRUSH CREEK
Built 1998
US101(HWY009) over GARRISON SLOUGH
Built 1976
FRONT RD HWY 009 over BRUSH CREEK
Built 1955
US101(HWY009) over BRUSH CREEK
Built 1955
ELK RIVER ROAD over LOWER BALD MTN CREEK
Built 1956
US101(HWY009) over BRUSH CREEK
Built 1955
US101(HWY009) over ELK RIVER
Built 1969
Bridge Details
- Structure #
- 02386A009 30884
- Year Built
- 1955
- Length
- 24.4 m (80.1 ft)
- Max Span
- 15.2 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 2,681
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.