US101(HWY009) over CRYSTAL CREEK
01.0 MI N HWY 250 JCT · County 015, Oregon · Built 1971 · 2 Lanes · 4,463 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.820506, -124.482869
This bridge is in worse condition than 28.7% of bridges in County 015. The average bridge in Oregon is 0 years old; this one is 55 years old.
Nearby Bridges
US101(HWY009) over SIXES RIVER
Built 1971
ACCESS RD HWY 009 over DRAINAGE DITCH
Built 1971
US101(HWY009) over ELK RIVER
Built 1969
SIXES RIVER RD over EDSON CREEK
Built 1955
US101(HWY009) over GARRISON SLOUGH
Built 1976
US101(HWY009) over HUBBARD CREEK
Built 1984
COUNTY RD 136 over WILLOW CREEK EB
Built 1961
US101(HWY009) over FLORAS CREEK
Built 1967
US101(HWY009) over BEAR TRAP CREEK
Built 1955
FLORAS CREEK RD over FLORAS CREEK
Built 1979
Bridge Details
- Structure #
- 00928A009 29549
- Year Built
- 1971
- Length
- 31.4 m (103 ft)
- Max Span
- 10.5 m
- Width
- 15.8 m (51.8 ft)
- Lanes
- 2
- Daily Traffic
- 4,463
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.