RIVERSIDE ST over US 97 (HWY 004)

009 MI S HWY 20 JCT · County 035, Oregon · Built 1968 · 2 Lanes · 8,287 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
09693 004 27593
Year Built
1968
Length
82.3 m (270 ft)
Max Span
46.6 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
8,287
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$971,000
Total Project Cost
$1,553,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.