OR 140 (HWY 020) over LINK RIVER

IN KLAMATH FALLS · County 035, Oregon · Built 1931 · 2 Lanes · 19,357 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
5
Fair

Bridge Details

Structure #
01579 020 00002
Year Built
1931
Length
61 m (200.1 ft)
Max Span
15.2 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
19,357
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$640,000
Total Project Cost
$1,025,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.