OR 140 (HWY 020) over CITY ST & UPRR
010 MI E OF HWY 4 IN K F · County 035, Oregon · Built 1957 · 4 Lanes · 19,357 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.217464, -121.770506
This bridge is in worse condition than 80.6% of bridges in County 035. The average bridge in Oregon is 0 years old; this one is 69 years old.
Nearby Bridges
MAIN ST over A CANAL
Built 1970
WASHBURN WAY over A CANAL
Built 1963
OR 39 (HWY 020)CON over PEDESTRIAN
Built 1963
WALL ST. BRIDGE over A CANAL
Built 2003
OR 140 (HWY 020) over LINK RIVER
Built 1931
OFF RAMP U S 97 over LINK RIVER
Built 1967
EBERLEIN RD over A CANAL
Built 2003
US 97 (HWY 004) over OLD ALIGN & BNSF
Built 2005
US 97 (HWY 004) over HWY 20 & LINK RIVER
Built 1963
WASHINGTON ST over A CANAL
Built 1978
Bridge Details
- Structure #
- 03849B020 00125
- Year Built
- 1957
- Reconstructed
- 1977
- Length
- 254.8 m (836 ft)
- Max Span
- 30.2 m
- Width
- 22.1 m (72.5 ft)
- Lanes
- 4
- Daily Traffic
- 19,357
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,677,000
- Total Project Cost
- $4,283,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.