OFF RAMP U S 97 over LINK RIVER

004 MI S HWY 20 JCT · County 035, Oregon · Built 1967 · 1 Lanes · 1,919 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
08347A004 27544
Year Built
1967
Length
160 m (524.9 ft)
Max Span
42.1 m
Width
8.1 m (26.6 ft)
Lanes
1
Daily Traffic
1,919
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,681,000
Total Project Cost
$2,690,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.