HWY 164 over Santiam River
005 MI S JEFFERSON · County 047, Oregon · Built 1933 · 2 Lanes · 8,644 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
44.714861, -123.01435
This bridge is in worse condition than 78.9% of bridges in County 047. The average bridge in Oregon is 0 years old; this one is 93 years old.
Nearby Bridges
HWY 164 over Santiam River OFlow
Built 2001
HWY 164 over Santiam River Oflow
Built 1960
HWY 164 over Santiam River OFlow #4
Built 1958
HIGBEE ROAD over SANTIAM OFLOW
Built 2000
I-5 (Hwy 1) NB over Santiam Overflow No. 7
Built 2001
I-5 (Hwy 1) SB over Santiam Overflow No. 7
Built 2003
Dever-Conner Road over I-5 (Hwy 1)
Built 1958
MILLER RD over OVERFLOW CHANNEL
Built 1963
I-5 (Hwy 1) NB over UPRR & Hwy 164
Built 2001
I-5 (Hwy 1) NB over Santiam Overflow No. 6
Built 2001
Bridge Details
- Structure #
- 01582 164 00624
- Year Built
- 1933
- Length
- 244.4 m (801.8 ft)
- Max Span
- 61 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 8,644
- Material
- Concrete Continuous
- Design
- Arch - Thru
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,824,000
- Total Project Cost
- $4,518,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.