OLD HWY 97 over HAY CREEK
1.0 MI NE OF HAY CREEK RD · County 031, Oregon · Built 1923 · 2 Lanes · 2,116 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
44.756089, -120.968461
This bridge is in worse condition than 52.5% of bridges in County 031. The average bridge in Oregon is 0 years old; this one is 103 years old.
Nearby Bridges
US 97 (Hwy 004) over Hay Creek
Built 2007
US 97 (HWY 004) over TROUT CREEK
Built 2019
HWY 293 over ANTELOPE CREEK
Built 2005
COLEMAN RD over TROUT CREEK
Built 1990
COLEMAN RD over TROUT CREEK
Built 1965
HWY 293 over ANTELOPE CREEK
Built 1966
GUMWOOD LANE over IRRIGATION CANAL
Built 1948
N Adams Dr. over North Unit Main Canal
Built 2003
ADAMS DR over IRRIGATION CANAL
Built 2005
IRR BIA RTE 8 over WARM SPRINGS RIVER
Built 1966
Bridge Details
- Structure #
- 00813 509 00174
- Year Built
- 1923
- Length
- 22.9 m (75.1 ft)
- Max Span
- 11.6 m
- Width
- 6.7 m (22 ft)
- Lanes
- 2
- Daily Traffic
- 2,116
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $240,000
- Total Project Cost
- $384,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.