HWY 293 over ANTELOPE CREEK

031 MI S HWY 4 JCT · County 065, Oregon · Built 1966 · 2 Lanes · 239 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
09452 293 00310
Year Built
1966
Length
27.4 m (89.9 ft)
Max Span
11 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
239
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.