COLEMAN RD over TROUT CREEK
4.1 MI NE OF GATEWAY · County 031, Oregon · Built 1990 · 1 Lanes · 45 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
44.801306, -121.065967
This bridge is in worse condition than 52.5% of bridges in County 031. The average bridge in Oregon is 0 years old; this one is 36 years old.
Nearby Bridges
COLEMAN RD over TROUT CREEK
Built 1965
IRR BIA RTE 8 over WARM SPRINGS RIVER
Built 1966
US 97 (Hwy 004) over Hay Creek
Built 2007
IRR ROUTE 13 over WARM SPRINGS RIVER
Built 2004
OLD HWY 97 over HAY CREEK
Built 1923
GUMWOOD LANE over IRRIGATION CANAL
Built 1948
N Adams Dr. over North Unit Main Canal
Built 2003
US 97 (HWY 004) over TROUT CREEK
Built 2019
HWY 293 over ANTELOPE CREEK
Built 2005
IRR BIA RTE 8001 over WARM SPRINGS RIVER
Built 1963
Bridge Details
- Structure #
- 31C52 B37 00000
- Year Built
- 1990
- Length
- 26.8 m (87.9 ft)
- Max Span
- 26.5 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 45
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $282,000
- Total Project Cost
- $451,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.