GUMWOOD LANE over IRRIGATION CANAL
2.7 MI E OF HWY 26 · County 031, Oregon · Built 1948 · 2 Lanes · 59 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
44.722642, -121.125242
This bridge is in worse condition than 21.3% of bridges in County 031. The average bridge in Oregon is 0 years old; this one is 78 years old.
Nearby Bridges
N Adams Dr. over North Unit Main Canal
Built 2003
ADAMS DR over IRRIGATION CANAL
Built 2005
DOGWOOD LANE over IRRIGATION CANAL
Built 1948
US 26 (HWY 053) over N UNIT CANAL
Built 1948
CHERRY LANE over IRRIGATION CANAL
Built 2003
NE MEADOWLARK LN over IRRIGATION CANAL
Built 1947
US 26 (Hwy 053) over BNSF
Built 2005
BIRCH LANE over IRRIGATION CANAL
Built 2000
US 26 (HWY 053) over DESCHUTES RIVER
Built 1934
US 97 (HWY 004)SB over WILLOW CREEK
Built 1966
Bridge Details
- Structure #
- 31C26 673000265
- Year Built
- 1948
- Reconstructed
- 1994
- Length
- 8.8 m (28.9 ft)
- Max Span
- 8.2 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 59
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.