US 26 (HWY 053) over N UNIT CANAL
018 MI N MADRAS · County 031, Oregon · Built 1948 · 2 Lanes · 9,652 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
44.668206, -121.138481
This bridge is in worse condition than 78.8% of bridges in County 031. The average bridge in Oregon is 0 years old; this one is 78 years old.
Nearby Bridges
CHERRY LANE over IRRIGATION CANAL
Built 2003
DOGWOOD LANE over IRRIGATION CANAL
Built 1948
US 26 (Hwy 053) over BNSF
Built 2005
BIRCH LANE over IRRIGATION CANAL
Built 2000
ADAMS DR over IRRIGATION CANAL
Built 2005
NE MEADOWLARK LN over IRRIGATION CANAL
Built 1947
US 97 (HWY 004)SB over WILLOW CREEK
Built 1966
US 97 (HWY 004)NB over WILLOW CREEK
Built 2006
7TH ST MADRAS over WILLOW CREEK EB
Built 1970
NE 9th Street over Willow Creek
Built 2012
Bridge Details
- Structure #
- 07074 053 11558
- Year Built
- 1948
- Length
- 11 m (36.1 ft)
- Max Span
- 5.5 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 9,652
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.