Smithfield T125 over PINEY FORK

0.1 Mi NW of St Rt 152 · County 081, Ohio · Built 1875 · 1 Lanes · 209 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
4133773
Year Built
1875
Reconstructed
2010
Length
15.9 m (52.2 ft)
Max Span
14.9 m
Width
4.6 m (15.1 ft)
Lanes
1
Daily Traffic
209
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.