Jeff CR8 over DRY FORK

1.3 miles N of SR150 · County 081, Ohio · Built 1935 · 2 Lanes · 473 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
4131584
Year Built
1935
Length
14 m (45.9 ft)
Max Span
6.1 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
473
Material
Concrete
Design
Arch - Deck
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.