CR8 over Dry Fork

1.55 Mi NW SR150 · County 081, Ohio · Built 2016 · 2 Lanes · 473 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
4131593
Year Built
2016
Length
11.9 m (39 ft)
Max Span
10.7 m
Width
27.4 m (89.9 ft)
Lanes
2
Daily Traffic
473
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$169,412,000
Total Project Cost
$169,412,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.