SR 152 over PINEY FORK CREEK

.01 MI N OF SR 150 · County 081, Ohio · Built 1950 · 2 Lanes · 1,074 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
4102673
Year Built
1950
Reconstructed
2006
Length
24.1 m (79.1 ft)
Max Span
9.1 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
1,074
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$250,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.