CR7 over Short Creek

1.2 Mi NE of CR6 · County 081, Ohio · Built 2018 · 2 Lanes · 1,000 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

40.199689, -80.811031

This bridge is in worse condition than 4.9% of bridges in County 081. The average bridge in Ohio is 0 years old; this one is 8 years old.

Nearby Bridges

Bridge Details

Structure #
4130228
Year Built
2018
Length
32 m (105 ft)
Max Span
31.1 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
1,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$650,000,000
Total Project Cost
$650,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.