T129 over Long Run

300-ft E of CR6/CR7 · County 081, Ohio · Built 2018 · 2 Lanes · 50 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

40.189969, -80.829031

This bridge is in worse condition than 4.9% of bridges in County 081. The average bridge in Ohio is 0 years old; this one is 8 years old.

Nearby Bridges

Bridge Details

Structure #
4131259
Year Built
2018
Length
6.9 m (22.6 ft)
Max Span
6.2 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
50
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$142,374,000
Total Project Cost
$142,374,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.