NM-50 over UNNAMED WATERWAY
1.02 MI EAST JCT I-25 · County 049, New Mexico · Built 2021 · 2 Lanes · 4,290 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
35.571817, -105.755381
This bridge is in worse condition than 48.6% of bridges in County 049. The average bridge in New Mexico is 0 years old; this one is 5 years old.
Nearby Bridges
NM-50 over I-25 NBL/SBL @ GLORIETA
Built 1986
NM-50 over UNNAMED WATERWAY
Built 1995
I-25 NB/SB over GALISTEO CREEK
Built 1957
I-25 NBL/SBL over VALENCIA EXIT
Built 1957
I-25 NB/SB over DEER CREEK
Built 1941
I-25 NBL/SBL over GALISTEO / APACHE
Built 1958
I-25 SBL over Local Rd
Built 2016
I-25 NBL over FR-2108
Built 2016
NM-63 over ALAMITOS CREEK
Built 1995
NM-63 over PECOS RIVER
Built 1963
Bridge Details
- Structure #
- 000000000009854
- Year Built
- 2021
- Length
- 13.1 m (43 ft)
- Max Span
- 12.2 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 4,290
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $44,000
- Total Project Cost
- $67,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.