NM-50 over I-25 NBL/SBL @ GLORIETA
JUNCTION I-25 & NM-50 · County 049, New Mexico · Built 1986 · 2 Lanes · 4,868 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
35.583078, -105.767486
This bridge is in worse condition than 83.1% of bridges in County 049. The average bridge in New Mexico is 0 years old; this one is 40 years old.
Nearby Bridges
I-25 NB/SB over GALISTEO CREEK
Built 1957
NM-50 over UNNAMED WATERWAY
Built 2021
I-25 NBL/SBL over VALENCIA EXIT
Built 1957
NM-50 over UNNAMED WATERWAY
Built 1995
I-25 NB/SB over DEER CREEK
Built 1941
I-25 NBL/SBL over GALISTEO / APACHE
Built 1958
I-25 SBL over Local Rd
Built 2016
I-25 NBL over FR-2108
Built 2016
NM-63 over ALAMITOS CREEK
Built 1995
NM-63 over PECOS RIVER
Built 1963
Bridge Details
- Structure #
- 000000000008576
- Year Built
- 1986
- Length
- 69.5 m (228 ft)
- Max Span
- 43.3 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 4,868
- Material
- Steel Continuous
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.