I-25 SBL over Local Rd
3.58 M N Jct I-25/US-285 · County 049, New Mexico · Built 2016 · 2 Lanes · 15,422 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
35.548056, -105.827722
This bridge is in worse condition than 64.3% of bridges in County 049. The average bridge in New Mexico is 0 years old; this one is 10 years old.
Nearby Bridges
I-25 NBL over FR-2108
Built 2016
I-25 NBL/SBL over GALISTEO / APACHE
Built 1958
I-25 NB/SB over DEER CREEK
Built 1941
I-25 SBL over CR-51 OJO DE LA VACA RD
Built 1972
I-25 NBL over CR-51 OJO DE LA VACA RD
Built 1972
I-25 NB/SB/FR2101 over UNNAMED WATERWAY
Built 1974
I-25 NBL over UNNAMED WATERWAY
Built 1974
NM-300 over CANADA DE LOS ALAMOS
Built 1946
I-25 NBL/SBL over VALENCIA EXIT
Built 1957
I-25 SBL over US 285
Built 1972
Bridge Details
- Structure #
- 000000000009630
- Year Built
- 2016
- Length
- 16.8 m (55.1 ft)
- Max Span
- 15.5 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 15,422
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.