I-25 SBL over CR-51 OJO DE LA VACA RD
2.28 M N JCT I-25/US-285 · County 049, New Mexico · Built 1972 · 2 Lanes · 14,184 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
35.538814, -105.848111
This bridge is in worse condition than 64.3% of bridges in County 049. The average bridge in New Mexico is 0 years old; this one is 54 years old.
Nearby Bridges
I-25 NBL over CR-51 OJO DE LA VACA RD
Built 1972
I-25 NB/SB/FR2101 over UNNAMED WATERWAY
Built 1974
I-25 NBL over UNNAMED WATERWAY
Built 1974
I-25 NBL over FR-2108
Built 2016
I-25 SBL over Local Rd
Built 2016
I-25 NBL/SBL over GALISTEO / APACHE
Built 1958
NM-300 over CANADA DE LOS ALAMOS
Built 1946
US-84 over CANADA DE LOS ALAMOS
Built 1972
US-285 over UNNAMED WATERWAY
Built 1939
I-25 NBL over US 285
Built 1972
Bridge Details
- Structure #
- 000000000007280
- Year Built
- 1972
- Reconstructed
- 1997
- Length
- 43 m (141.1 ft)
- Max Span
- 16.8 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 14,184
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $260,000
- Total Project Cost
- $450,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.