I-25 NBL over US 285
JUNCTION I-25 / US 285 · County 049, New Mexico · Built 1972 · 2 Lanes · 14,184 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
35.554608, -105.878836
This bridge is in worse condition than 64.3% of bridges in County 049. The average bridge in New Mexico is 0 years old; this one is 54 years old.
Nearby Bridges
I-25 SBL over US 285
Built 1972
US-285 over UNNAMED WATERWAY
Built 1939
US-84 over CANADA DE LOS ALAMOS
Built 1972
NM-300 over CANADA DE LOS ALAMOS
Built 1946
Avenida Amistad over Unnamed Waterway
Built 1999
Ave Vista Grande over Unnamed Waterway
Built 1999
I-25 NB/SB/FR2101 over UNNAMED WATERWAY
Built 1974
I-25 NBL over UNNAMED WATERWAY
Built 1974
I-25 SBL over ANCHO CANYON
Built 1972
I-25 SBL over CANADA ANCHA
Built 1974
Bridge Details
- Structure #
- 000000000007277
- Year Built
- 1972
- Reconstructed
- 2001
- Length
- 83.2 m (273 ft)
- Max Span
- 25.3 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 14,184
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $390,000
- Total Project Cost
- $630,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.