53-0116 over RIO PUERCO RIVER
1 MI SW OF US-60/BERNARDO · County 053, New Mexico · Built 2018 · 2 Lanes · 231 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.409508, -106.853506
This bridge is in worse condition than 50.8% of bridges in County 053. The average bridge in New Mexico is 0 years old; this one is 8 years old.
Nearby Bridges
I-25 SBL over Rio Puerco
Built 2012
I-25 NBL over Rio Puerco
Built 2012
I-25 SBL over US-60
Built 1958
I-25 NBL over US-60
Built 1958
US-60 over BNSF RAILROAD
Built 1982
US-60 over SAN FRANCISCO RIVERSIDE
Built 1982
US-60 over Rio Grande River
Built 1988
NM-304 over Salas Arroyo
Built 1974
I-25 NBL/SBL over LOCAL ROAD
Built 1965
NM-116 over UNNAMED WATERWAY
Built 1992
Bridge Details
- Structure #
- 000000000009805
- Year Built
- 2018
- Length
- 173.7 m (569.9 ft)
- Max Span
- 57.9 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 231
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $900,000
- Total Project Cost
- $1,540,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.