NM-304 over Salas Arroyo
4.7 Mi S of US-60/NM-304 · County 053, New Mexico · Built 1974 · 2 Lanes · 208 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
34.363222, -106.831797
This bridge is in worse condition than 95.2% of bridges in County 053. The average bridge in New Mexico is 0 years old; this one is 52 years old.
Nearby Bridges
I-25 NBL/SBL over LOCAL ROAD
Built 1965
I-25 NBL over Rio Puerco
Built 2012
I-25 SBL over Rio Puerco
Built 2012
I-25 NBL over US-60
Built 1958
I-25 SBL over US-60
Built 1958
53-0116 over RIO PUERCO RIVER
Built 2018
US-60 over SAN FRANCISCO RIVERSIDE
Built 1982
US-60 over BNSF RAILROAD
Built 1982
US-60 over Rio Grande River
Built 1988
I-25 SBL over Rio Salado
Built 1958
Bridge Details
- Structure #
- 000000000007481
- Year Built
- 1974
- Length
- 38.1 m (125 ft)
- Max Span
- 11.3 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 208
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $290,000
- Total Project Cost
- $510,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.