I-25 NBL over US-60
Jct I-25/US-60 @ Bernardo · County 053, New Mexico · Built 1958 · 2 Lanes · 11,943 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
34.408042, -106.846467
This bridge is in worse condition than 79.4% of bridges in County 053. The average bridge in New Mexico is 0 years old; this one is 68 years old.
Nearby Bridges
I-25 SBL over US-60
Built 1958
I-25 NBL over Rio Puerco
Built 2012
I-25 SBL over Rio Puerco
Built 2012
53-0116 over RIO PUERCO RIVER
Built 2018
US-60 over BNSF RAILROAD
Built 1982
US-60 over SAN FRANCISCO RIVERSIDE
Built 1982
US-60 over Rio Grande River
Built 1988
NM-304 over Salas Arroyo
Built 1974
I-25 NBL/SBL over LOCAL ROAD
Built 1965
NM-116 over UNNAMED WATERWAY
Built 1992
Bridge Details
- Structure #
- 000000000005983
- Year Built
- 1958
- Reconstructed
- 1990
- Length
- 43.9 m (144 ft)
- Max Span
- 14.3 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 11,943
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.