NM-28 over San Miguel Lateral
19.4 M N OF TEXAS ST LINE · County 013, New Mexico · Built 2017 · 2 Lanes · 3,180 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.158633, -106.737653
This bridge is in worse condition than 46.7% of bridges in County 013. The average bridge in New Mexico is 0 years old; this one is 9 years old.
Nearby Bridges
13-B036 over IRRIGATION CANAL
Built 1940
NM-192 over RIO GRANDE
Built 1992
13-B046 over IRRIGATION CANAL
Built 1979
NM-228 over EASTSIDE CANAL
Built 1962
13-B055 over EAST SIDE CANAL
Built 1956
13-B057 over EAST SIDE CANAL
Built 1956
NM-28 over RIO GRANDE
Built 1989
CR B-31 over IRRIGATION CANAL
Built 1974
NM-228 over I-10 WBL/EBL Mesquite
Built 2015
13-C010 over IRRIGATION CANAL
Built 1979
Bridge Details
- Structure #
- 000000000009705
- Year Built
- 2017
- Length
- 8.2 m (26.9 ft)
- Max Span
- 2.4 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 3,180
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.