NM-192 over RIO GRANDE
1.2 MI E OF NM-28 · County 013, New Mexico · Built 1992 · 2 Lanes · 2,777 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.161589, -106.716419
This bridge is in worse condition than 64% of bridges in County 013. The average bridge in New Mexico is 0 years old; this one is 34 years old.
Nearby Bridges
NM-28 over San Miguel Lateral
Built 2017
NM-228 over EASTSIDE CANAL
Built 1962
13-B036 over IRRIGATION CANAL
Built 1940
13-B046 over IRRIGATION CANAL
Built 1979
CR B-31 over IRRIGATION CANAL
Built 1974
NM-228 over I-10 WBL/EBL Mesquite
Built 2015
13-B055 over EAST SIDE CANAL
Built 1956
I-10 EBL over UNNAMED WATERWAY
Built 1955
13-B057 over EAST SIDE CANAL
Built 1956
NM-28 over RIO GRANDE
Built 1989
Bridge Details
- Structure #
- 000000000008765
- Year Built
- 1992
- Length
- 147.1 m (482.6 ft)
- Max Span
- 29.7 m
- Width
- 15.1 m (49.5 ft)
- Lanes
- 2
- Daily Traffic
- 2,777
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.