13-B036 over IRRIGATION CANAL
.55 M W NM-28 @ MP 19.20 · County 013, New Mexico · Built 1940 · 1 Lanes · 337 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
32.149397, -106.737311
This bridge is in worse condition than 97.3% of bridges in County 013. The average bridge in New Mexico is 0 years old; this one is 86 years old.
Nearby Bridges
NM-28 over San Miguel Lateral
Built 2017
NM-192 over RIO GRANDE
Built 1992
NM-228 over EASTSIDE CANAL
Built 1962
13-B046 over IRRIGATION CANAL
Built 1979
13-B055 over EAST SIDE CANAL
Built 1956
CR B-31 over IRRIGATION CANAL
Built 1974
13-B057 over EAST SIDE CANAL
Built 1956
NM-28 over RIO GRANDE
Built 1989
NM-228 over I-10 WBL/EBL Mesquite
Built 2015
I-10 EBL over UNNAMED WATERWAY
Built 1955
Bridge Details
- Structure #
- 000000000007703
- Year Built
- 1940
- Reconstructed
- 1960
- Length
- 10.1 m (33.1 ft)
- Max Span
- 9.4 m
- Width
- 5.1 m (16.7 ft)
- Lanes
- 1
- Daily Traffic
- 337
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $21,000
- Total Project Cost
- $32,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.