I-25 NBL over NM-14 MP 46.6
1.5 M N Jct I-25/NM-599 · County 049, New Mexico · Built 2017 · 4 Lanes · 34,354 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.604892, -106.034906
This bridge is in worse condition than 48.6% of bridges in County 049. The average bridge in New Mexico is 0 years old; this one is 9 years old.
Nearby Bridges
I-25 SBL over NM-14 Cerrillos Rd
Built 2017
Rancho Viejo Blvd. over Unnamed Waterway
Built 2015
NM-14 over ARROYO CHAMISOS
Built 1954
NM-14 over ARROYO HONDO
Built 1979
NM-599 over ARROYO HONDO
Built 1992
I-25 NBL/SBL over ARROYO HONDO
Built 1954
FR-2098 over ARROYO HONDO
Built 1976
FL-5802 over ARROYO DE LOS CHAMISOS
Built 2004
I-25 NBL over NM 599
Built 1990
I-25 SBL over NM 599
Built 1990
Bridge Details
- Structure #
- 000000000009679
- Year Built
- 2017
- Length
- 81.7 m (268 ft)
- Max Span
- 39.9 m
- Width
- 18.3 m (60 ft)
- Lanes
- 4
- Daily Traffic
- 34,354
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.