FR-2098 over ARROYO HONDO
1.60 MI S OF JCT NM-14 · County 049, New Mexico · Built 1976 · 2 Lanes · 3,288 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
35.593603, -106.058689
This bridge is in worse condition than 64.3% of bridges in County 049. The average bridge in New Mexico is 0 years old; this one is 50 years old.
Nearby Bridges
I-25 NBL/SBL over ARROYO HONDO
Built 1954
NM-599 over ARROYO HONDO
Built 1992
I-25 NBL over NM 599
Built 1990
I-25 SBL over NM 599
Built 1990
NM-14 over ARROYO HONDO
Built 1979
IG-2276 over ARROYO HONDO
Built 1992
Rancho Viejo Blvd. over Unnamed Waterway
Built 2015
NM-599 over ARROYO DE LOS CHAMISOS
Built 1992
I-25 NBL over NM-14 MP 46.6
Built 2017
I-25 SBL over NM-14 Cerrillos Rd
Built 2017
Bridge Details
- Structure #
- 000000000007474
- Year Built
- 1976
- Length
- 42.4 m (139.1 ft)
- Max Span
- 14 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 3,288
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.