NM-599 over ARROYO DE LOS CHAMISOS
2.2mi North Jct NM 14 · County 049, New Mexico · Built 1992 · 4 Lanes · 18,212 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
35.612844, -106.071581
This bridge is in worse condition than 64.3% of bridges in County 049. The average bridge in New Mexico is 0 years old; this one is 34 years old.
Nearby Bridges
49001 Jaguar Drive over NM-599 NBL /SBL M.P. 2.6
Built 2016
IG-2276 over ARROYO HONDO
Built 1992
FR-2098 over ARROYO HONDO
Built 1976
I-25 NBL/SBL over ARROYO HONDO
Built 1954
NM-599 over ARROYO HONDO
Built 1992
49-0056 over SANTA FE RIVER
Built 1988
I-25 SBL over NM 599
Built 1990
I-25 NBL over NM 599
Built 1990
N. Paseo Del Ange over Unnamed Waterway
Built 2012
NM-599 over SANTA FE RIVER
Built 1991
Bridge Details
- Structure #
- 000000000010054
- Year Built
- 1992
- Length
- 25.1 m (82.3 ft)
- Max Span
- 3 m
- Lanes
- 4
- Daily Traffic
- 18,212
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.