FL-5802 over ARROYO DE LOS CHAMISOS
0.1 M E JCT NM-14 · County 049, New Mexico · Built 2004 · 2 Lanes · 4,328 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
35.627111, -106.022394
This bridge is in worse condition than 48.6% of bridges in County 049. The average bridge in New Mexico is 0 years old; this one is 22 years old.
Nearby Bridges
NM-14 over ARROYO CHAMISOS
Built 1954
FL-4727 over ARROYO CHAMISOS
Built 1985
I-25 SBL over RICHARDS AVENUE
Built 1976
I-25 NBL over RICHARDS AVE 490064
Built 1976
I-25 SBL over NM-14 Cerrillos Rd
Built 2017
I-25 NBL over NM-14 MP 46.6
Built 2017
South Meadows Rd. over SANTA FE RIVER
Built 2011
Caja del Oro Grant over SANTA FE RIVER
Built 1987
FL-5785 over SIRINGO DRAINAGE
Built 1992
Rancho Viejo Blvd. over Unnamed Waterway
Built 2015
Bridge Details
- Structure #
- 000000000009362
- Year Built
- 2004
- Length
- 26.8 m (87.9 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 4,328
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.