I-25 NBL over RICHARDS AVE 490064
2.2 MI N JCT NM-14/I-25 · County 049, New Mexico · Built 1976 · 2 Lanes · 34,354 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
35.619786, -106.000489
This bridge is in worse condition than 83.1% of bridges in County 049. The average bridge in New Mexico is 0 years old; this one is 50 years old.
Nearby Bridges
I-25 SBL over RICHARDS AVENUE
Built 1976
FL-5802 over ARROYO DE LOS CHAMISOS
Built 2004
FL-4727 over ARROYO CHAMISOS
Built 1985
NM-14 over ARROYO CHAMISOS
Built 1954
I-25 SBL over NMRX
Built 2009
FL-5785 over SIRINGO DRAINAGE
Built 1992
I-25 NBL over SF Southern R/R
Built 1974
I-25 SBL over SF Southern R/R
Built 1974
I-25 SBL over NM-14 Cerrillos Rd
Built 2017
I-25 NBL over NM-14 MP 46.6
Built 2017
Bridge Details
- Structure #
- 000000000007471
- Year Built
- 1976
- Length
- 43.6 m (143 ft)
- Max Span
- 17.1 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 34,354
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $100,000
- Total Project Cost
- $300,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.