03-0007 over TROUT CREEK
2.8 Mi N Of Luna NM · County 003, New Mexico · Built 1939 · 1 Lanes · 158 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
33.846997, -108.954708
This bridge is in worse condition than 97% of bridges in County 003. The average bridge in New Mexico is 0 years old; this one is 87 years old.
Nearby Bridges
03-0007 over Dillman Creek
Built 1993
US-180 over SAN FRANCISCO RIVER
Built 1992
03-B007 over Bishop Canyon
Built 1938
03-0366 over LOWER TROUT CREEK
Built 1980
US-180 over HOLLOW CREEK
Built 1952
US-180 over SAN FRANCISCO RIVER
Built 1990
03-B007 over S.A. Canyon Tributary
Built 1938
03-B007 over Sand Creek
Built 1938
03-B007 over S.A CREEK
Built 1939
FSR 220 over ROMERO CREEK
Built 1954
Bridge Details
- Structure #
- 000000000009446
- Year Built
- 1939
- Length
- 15.9 m (52.2 ft)
- Max Span
- 7.9 m
- Width
- 5 m (16.4 ft)
- Lanes
- 1
- Daily Traffic
- 158
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $500,000
- Total Project Cost
- $1,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.