03-B007 over S.A CREEK
8.9 MI N JCT US-180 · County 003, New Mexico · Built 1939 · 1 Lanes · 158 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
33.922894, -108.923528
This bridge is in worse condition than 86% of bridges in County 003. The average bridge in New Mexico is 0 years old; this one is 87 years old.
Nearby Bridges
03-B007 over Sand Creek
Built 1938
03-B007 over S.A. Canyon Tributary
Built 1938
03-B007 over Bishop Canyon
Built 1938
03-B007 over N Tributary Spur Lake
Built 1939
03-0007 over TROUT CREEK
Built 1939
FSR 220 over ROMERO CREEK
Built 1954
03-0007 over Dillman Creek
Built 1993
03-0366 over LOWER TROUT CREEK
Built 1980
US-180 over SAN FRANCISCO RIVER
Built 1992
US-180 over SAN FRANCISCO RIVER
Built 1990
Bridge Details
- Structure #
- 000000000001002
- Year Built
- 1939
- Length
- 7.9 m (25.9 ft)
- Max Span
- 7.6 m
- Width
- 4.6 m (15.1 ft)
- Lanes
- 1
- Daily Traffic
- 158
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $150,000
- Total Project Cost
- $300,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.