03-B007 over Bishop Canyon

5.5 Mi. N. Of Jct. US 180 · County 003, New Mexico · Built 1938 · 1 Lanes · 158 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000001005
Year Built
1938
Length
7.8 m (25.6 ft)
Max Span
7 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
158
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$250,000
Total Project Cost
$500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.