FL-6301 over RIO GRANDE
0.1 MI N NM-273 · County 013, New Mexico · Built 2006 · 4 Lanes · 11,107 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
31.799072, -106.563633
This bridge is in worse condition than 88.9% of bridges in County 013. The average bridge in New Mexico is 0 years old; this one is 20 years old.
Nearby Bridges
NM-498 over RIO GRANDE
Built 1972
NM-498 over MONTOYA MAIN LATERAL
Built 1959
FRONTERA RD over DRAINAGE DITCH
Built 1971
J.C. MACHUCA RD over DRAINAGE DITCH
Built 1971
US 85 EB ON RAMP over OFF RAMP TO IH 10
Built 2017
US 85 EBFR over OXIDATION DAM OUTLET
Built 2019
US 85 EB ON RAMP over OXIDATIONDAM/SPDC/EBRAMP
Built 2019
US 85 EB ON RAMP over OXIDATION DAM OUTLET
Built 2019
IH 10 EB ON RAMP#2 over OXIDATION DAM OUTLET
Built 2019
ANAPRA RD over RIO GRANDE RIVER
Built 2004
Bridge Details
- Structure #
- 000000000009359
- Year Built
- 2006
- Length
- 263.9 m (865.8 ft)
- Max Span
- 37.6 m
- Width
- 21.6 m (70.9 ft)
- Lanes
- 4
- Daily Traffic
- 11,107
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.