IH 10 EB ON RAMP#2 over OXIDATION DAM OUTLET

0.5 MI S OF SUNLAND PK RD · County 141, Texas · Built 2019 · 2 Lanes · 10,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
240720212102330
Year Built
2019
Length
83.5 m (274 ft)
Max Span
28 m
Width
19.2 m (63 ft)
Lanes
2
Daily Traffic
10,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.