US 85 EB ON RAMP over OXIDATIONDAM/SPDC/EBRAMP
.31MI.SE OF SUNLAND PARK · County 141, Texas · Built 2019 · 2 Lanes · 10,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
31.811381, -106.546439
This bridge is in worse condition than 24% of bridges in County 141. The average bridge in Texas is 0 years old; this one is 7 years old.
Nearby Bridges
US 85 EB ON RAMP over OFF RAMP TO IH 10
Built 2017
US 85 EB ON RAMP over OXIDATION DAM OUTLET
Built 2019
IH 10 EB ON RAMP#2 over OXIDATION DAM OUTLET
Built 2019
US 85 EBFR over OXIDATION DAM OUTLET
Built 2019
US 85 WB FR over IH 10 / SPDC / RAMP
Built 2019
US 85 WB over IH 10 / WBCD / RAMP
Built 2019
IH 10 WB OFF RAMP over OXIDATION DAM OUTLET
Built 2018
IH 10 WBCD over OXIDATION DAM OUTLET
Built 2019
IH 10 WB over DRAIN
Built 1963
IH 10 EB over DRAIN
Built 1963
Bridge Details
- Structure #
- 240720212102328
- Year Built
- 2019
- Length
- 515.1 m (1690 ft)
- Max Span
- 39.6 m
- Width
- 15.9 m (52.2 ft)
- Lanes
- 2
- Daily Traffic
- 10,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.