NM-63 over GLORIETA CREEK
2.5 m. S from Jct. NM-223 · County 047, New Mexico · Built 2004 · 2 Lanes · 968 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.539728, -105.683689
This bridge is in worse condition than 50.3% of bridges in County 047. The average bridge in New Mexico is 0 years old; this one is 22 years old.
Nearby Bridges
FORKED LIGHTNING R over GLORIETA WASH
Built 1950
FR-2116 over UNNAMED WATERWAY
Built 1941
NM-63 over ALAMITOS CREEK
Built 1995
NM-223 over PECOS RIVER
Built 1988
NM-50 over UNNAMED WATERWAY
Built 1995
I-25 SBL over NM-63
Built 2009
I-25 NB over NM-63
Built 1964
NM-63 over PECOS RIVER
Built 1963
NM-50 over UNNAMED WATERWAY
Built 2021
NM-50 over I-25 NBL/SBL @ GLORIETA
Built 1986
Bridge Details
- Structure #
- 000000000008880
- Year Built
- 2004
- Length
- 25.9 m (85 ft)
- Max Span
- 25.9 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 968
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.