06-Z000 over I-40 EBL/WBL MP 131.3
4.5 MI E OF JCT NM-6 · County 006, New Mexico · Built 1991 · 2 Lanes · 434 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.989186, -107.095883
This bridge is in worse condition than 54.3% of bridges in County 006. The average bridge in New Mexico is 0 years old; this one is 35 years old.
Nearby Bridges
IRR/I-40 EBL/WBL over ARROYO MIRANOA
Built 1935
IRR/I-40 EBL/WBL over UNNAMED WATERWAY
Built 1967
IRR/NM-6 over I-40 EBL/WBL MP 126.8
Built 1991
NM-6 over LUCERO ARROYO
Built 2018
NM-6 over UNNAMED WATERWAY
Built 2018
IRR/NM-6 over Rio San Jose
Built 2018
I-40 WBL over Canada Del Los Apaches
Built 1957
I-40 EBL over Canada Del Los Apaches
Built 1957
06-C084 over BNSF RAILROAD
Built 1934
IRR/I-40 EBL/WBL over UNNAMED WATERWAY
Built 1959
Bridge Details
- Structure #
- 000000000008635
- Year Built
- 1991
- Length
- 77 m (252.6 ft)
- Max Span
- 37.8 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 434
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.