IRR/I-40 EBL/WBL over ARROYO MIRANOA
4.O MI E OF JCT NM-6 · County 006, New Mexico · Built 1935 · 4 Lanes · 27,539 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
34.986833, -107.102517
This bridge is in worse condition than 76.4% of bridges in County 006. The average bridge in New Mexico is 0 years old; this one is 91 years old.
Nearby Bridges
06-Z000 over I-40 EBL/WBL MP 131.3
Built 1991
IRR/I-40 EBL/WBL over UNNAMED WATERWAY
Built 1967
IRR/NM-6 over I-40 EBL/WBL MP 126.8
Built 1991
NM-6 over LUCERO ARROYO
Built 2018
NM-6 over UNNAMED WATERWAY
Built 2018
IRR/NM-6 over Rio San Jose
Built 2018
06-C084 over BNSF RAILROAD
Built 1934
I-40 WBL over Canada Del Los Apaches
Built 1957
I-40 EBL over Canada Del Los Apaches
Built 1957
IRR/I-40 EBL/WBL over UNNAMED WATERWAY
Built 1959
Bridge Details
- Structure #
- 000000000006082
- Year Built
- 1935
- Reconstructed
- 1958
- Length
- 8.5 m (27.9 ft)
- Max Span
- 3.7 m
- Lanes
- 4
- Daily Traffic
- 27,539
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.