I-40 EBL over Canada Del Los Apaches

10.0 M E Jct I-40/ NM-6 · County 001, New Mexico · Built 1957 · 2 Lanes · 28,850 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000005816
Year Built
1957
Reconstructed
2005
Length
46.9 m (153.9 ft)
Max Span
10.1 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
28,850
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$280,000
Total Project Cost
$480,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.