FR-4051 over Rio Puerco
13.8 Mi E Jct I-40 & NM-6 · County 001, New Mexico · Built 2001 · 2 Lanes · 2,198 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.033681, -106.942139
This bridge is in worse condition than 28% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 25 years old.
Nearby Bridges
I-40 EBL over UNNAMED WATERWAY
Built 1968
I-40 EBL over Rio Puerco
Built 2011
FR4047 over I-40WBL/EBL
Built 1969
I-40 EBL/WBL/FRTG over CANADA DEL OJO
Built 1967
I-40 WBL over Rio Puerco
Built 1989
I-40 WBL over UNNAMED WATERWAY
Built 1954
I-40 Frontage Rd over CANADA DEL OJO
Built 1967
FR-4046 over UNNAMED WATERWAY
Built 1968
EB Frontage Road over I-40 WB Off-Ramp
Built 2014
FR-4051 over UNNAMED WATERWAY
Built 1933
Bridge Details
- Structure #
- 000000000009234
- Year Built
- 2001
- Length
- 89.6 m (294 ft)
- Max Span
- 31.1 m
- Width
- 14.6 m (47.9 ft)
- Lanes
- 2
- Daily Traffic
- 2,198
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.